英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
relinquit查看 relinquit 在百度字典中的解释百度英翻中〔查看〕
relinquit查看 relinquit 在Google字典中的解释Google英翻中〔查看〕
relinquit查看 relinquit 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • S-Basis in MMPDS-03 | Eng-Tips
    Hi, I would like to understand something about S-Basis in MMPDS-03 (because, my knowledge is limited in M P engineering field) In order to be complaint with the FAR regulation (item 23 613), one economical method is to select materials in MMPDS that contain both A- B- Basis allowables
  • Cold Stabilization vs S-basis - Eng-Tips
    From what I gather from the reading, S-basis defines a standard-based minimum value, where-as the A and B bases guarantee that a minimum percentage (either 90 or 99) of lots of the material will meet or exceed those values And that, depending on the material, the S basis could be higher or lower than A or B basis
  • Sample Size in determining A and B-Basis allowables - Eng-Tips
    I seem to remember from my school days that there were different smaple sizes required if one was determining A vs B-basis allowables However, the latest data that I see indicates that a minimum sample size is 100 (assuming a standard distributions) from a minimum number of lots This is
  • EASA CS 23. 613 Requirement | Eng-Tips
    S-basis allowable ? 2 “premium selection” of the material ? Does it mean a single test of particular raw material to be used in design 3 If I test the raw material (exact heat only) and use that values, I dont need to generate statisc based allowables " (e) Design values greater than the guaranteed minimum’s required by this paragraph
  • MIL-HDBK-5 MMPDS ISSUE?!?!# @# | Eng-Tips
    S-basis can be relatively safe for preliminary sizing, but approaching certification the authorities' (basically FAA or JAA) representative should be demanding that testing be scheduled to generate A- or B-basis allowables as appropriate
  • Potential Transformer Primary Fuse Basis for Sizing | Eng-Tips
    Greetings: Would be grateful for your thoughts regarding the origin of any bases used for the inrush capability of primary fuses for potential transformers I have a GE JVM-3 PT (2400-kV, 750-VA) with an EJ-1 fuse Also an ancient ITE PT-6 PT (600-VA, 480-V) with Gould A6Y7E-96 fuses
  • Converting Air Pollutant Concentrations and Other Formulas
    Correcting Concentrations to a Dry Basis: If a gaseous emission sample is analyzed and found to contain water vapor and a pollutant concentration of X, then X should be designated as the "wet basis" pollutant concentration The following equation can be used to correct the measured "wet basis" concentration to a "dry basis" concentration:
  • Motor Temperature Rise Service Factor, Effects on life expectancy
    Hi guys, We purchase a Altas Copco compressor coupled to a Siemens brand motor with nameplate data, 750 kw, 460 volt delta, 60 hz, 0 88pf, nominal efficiency 95 8% Full load Amphere(FLA)= 1100 amps, Service Factor(SF)= 1 15, SFA= 1300 Amps, RPM= 1788, Insulation Class F, Temperature rise 40
  • Straightness based GD amp;T understanding | Eng-Tips
    What's the correct understanding on below straightness definition?
  • Two-Phase Separator Sizing - Hold up time criteria . . . . Whats the . . .
    Does anyone know what is the basis for 100 mm or 300 mm height differences in between the levels ? how about basis for time? The vessel I am checking the size for, doesn't meet the above liquid criteria and I wanna to rationalize justify to ignoring these criteria I mean not really ignoring, but changing a little bit in the height





中文字典-英文字典  2005-2009