英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:

putrescible    
可腐败的

可腐败的

putrescible
adj 1: liable to decay or spoil or become putrid [synonym:
{decayable}, {putrescible}, {putrefiable}, {spoilable}]


请选择你想看的字典辞典:
单词字典翻译
putrescible查看 putrescible 在百度字典中的解释百度英翻中〔查看〕
putrescible查看 putrescible 在Google字典中的解释Google英翻中〔查看〕
putrescible查看 putrescible 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Solved 1- San Francisco-Oakland Bay Bridge (The given | Chegg. com
    Question: 1- San Francisco-Oakland Bay Bridge (The given information is the real dimensions) Find the tension in the cable at point C, TO, the angle at C Find the length of the cable for the main span of the bridge between A and B Find Tension at B y B A С -X=300" Span= 2,310 ft Height (sag) (y)= 526 ft Point C located x=3b0' from the mid
  • Solved 1- San Francisco-Oakland Bay Bridge (The given | Chegg. com
    Question: 1- San Francisco-Oakland Bay Bridge (The given information is the real dimensions) Find the tension in the cable at point C,T0, the angle at C Find the length of the cable for the main span of the bridge between A and B Find Tension at B Uniform load on each cable =60kip ft including the selfweight of the cable You do not need to consider any other load
  • Solved 1- San Francisco-Oakland Bay Bridge (The given | Chegg. com
    1- San Francisco-Oakland Bay Bridge (The given information is the real dimensions) Find the tension in the cable at point C, TO, the angle at C Find the length of the cable for the main span of the bridge between A and B Find Tension at B X300 Span-2,310 Height (sag) ) $26 A Point Clocated x-300' from the mid span point Point A Mid Span
  • Solved The new span of the San Francisco Oakland Bay bridge - Chegg
    The new span of the San Francisco Oakland Bay bridge was completed in 2013 at a cost of $6,900 million To compare the cost of the new span with the cost of a similar bridge built 58 years earlier (in 1955), one would calculate the cost of the new bridge in 1955 dollars
  • Solved Problem 3: The east span of the San | Chegg. com
    Civil Engineering questions and answers Problem 3: The east span of the San Francisco-to-Oakland Bridge was damaged in the 1989 Loma Prieta Earthquake Caltrans decided to replace it with a new bridge, which was open to the public in 2013 The old bridge was demolished in 2018 ; see Figure 3 (a) for the new bridge and the old one under demolition
  • Solved Which earthquake was used as an example for | Chegg. com
    See Answer Question: Which earthquake was used as an example for liquefaction destruction on the PNSNwebsite?Group of answer choices1995 Kobe, Japan1985 Mexico City, Mexico1968 Lima, Peru2011 Christchurch, New Zealand1989, San Francisco-Oakland, California Which earthquake was used as an example for liquefaction destruction on





中文字典-英文字典  2005-2009