英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:

thresher    音标拼音: [θr'ɛʃɚ]
n. 打谷者,打谷机,长尾鲨

打谷者,打谷机,长尾鲨

thresher
n 1: a farm machine for separating seeds or grain from the husks
and straw [synonym: {thresher}, {thrasher}, {threshing
machine}]
2: large pelagic shark of warm seas with a whiplike tail used to
round up small fish on which to feed [synonym: {thresher},
{thrasher}, {thresher shark}, {fox shark}, {Alopius
vulpinus}]


请选择你想看的字典辞典:
单词字典翻译
thresher查看 thresher 在百度字典中的解释百度英翻中〔查看〕
thresher查看 thresher 在Google字典中的解释Google英翻中〔查看〕
thresher查看 thresher 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • opsportal. spp. org
    The primary objective of this ESR-LA is to evaluate the impacts of an ESR withdrawing energy from the Transmission System The study will identify the steady state system constraints associated with connecting the ESR to the area transmission system The study is designed to identify the maximum allowed withdraw of the interconnecting Generating Facility without requiring additional Network
  • opsportal. spp. org
    This document includes all preliminary assessment results for the month of September 2016
  • Transmission Study Listing - OpsPortal
    Transmission Study Listing - OpsPortal
  • opsportal. spp. org
    The purpose of the Provisional Load Process (PLP) of Attachment AX is to provide Transmission Customers (Customer) with a process for addition or modification of delivery points, and the Customer does not have enough existing Designated Resources to serve the increased load plus losses This document provides the guidelines for interaction between Transmission Customers and SPP pertaining to
  • Index - OpsPortal
    DC Tie Viewer History
  • opsportal. spp. org
    12 11 2025 9509992
  • opsportal. spp. org
    6 18 2025 23
  • Generator Interconnection Active Request Listing - OpsPortal
    The Generator Interconnection Active Request Listing provides information on active generator interconnection requests managed by the SPP OpsPortal
  • opsportal. spp. org
    Results of this study determine whether there will be sufficient stability and reliability margin on the Transmission System with anticipated topology to accommodate Interconnection Requests for each Generating Facility at the Interconnection Customer’s requested In-Service Date
  • Generator Interconnection Study Listing - OpsPortal
    Generator Interconnection Study Listing - OpsPortal





中文字典-英文字典  2005-2009